top of page

Search Results

363 items found for ""

  • Skyport Plaza

    Skyport Plaza San Jose, CA 1,176,000 SF project consisting of three 8-story structural steel/precast concrete panel office towers, two steel frame retail structures and two 4-story concrete parking structures with parking for 1,840 cars. Extensive sitework and offsite improvements were also included in this phase of the project along with 340,000 SF office tenant improvements on sixteen floors within two existing 8-story buildings for Siemens. Services Provided: Architect of Record: Client: News: Construction Kenneth Rodrigues & Partners, Inc Equity Office Properties None Completed 2001 Corporate ​ ​ BACK TO PROJECTS

  • St. Francis Sobrato Family Learning Commons

    St. Francis Sobrato Family Learning Commons Mountain View, CA This 23,500 SF project consists of a new library, student center, counseling offices, study rooms, student activities center, campus store, two new classrooms, and renovation of six existing classrooms. Project includes the demolition of approximately 10,000 SF of an existing building and the renovation/improvements of the remaining 5,800 SF that will be made a part of the new building. Due to needs of the school, project required an involved phasing plan allowing portions of the existing building to remain occupied during construction. Services Provided: Architect of Record: Client: News: Construction HMC Architects St. Francis High School None Completed 2012 Education ​ ​ BACK TO PROJECTS

  • UOP Janssen Lagorio Gym

    UOP Janssen Lagorio Gym Stockton, CA This project features a 23,000 SF construction of new multi-purpose sports and recreation facility for basketball, volleyball, and other intercollegiate sports and recreational activities. In addition to the large, high ceiling space, there will be storage spaces, restrooms and a small training room. Services Provided: Architect of Record: Client: News: Construction WMB Architects University of the Pacific None Completed 2009 Education Athletic Center ​ BACK TO PROJECTS

  • Villa Siena Nursing Care Units

    Villa Siena Nursing Care Units Mountain View, CA This 14,074 SF wood frame construction consists of an expansion, and a full retrofit of the existing skilled nursing facility at Villa Siena. The new facility holds 22 bedrooms (with 30 total residents) and is built in three phases with adjacent phases being fully operational during construction. This is an OSHPD-2 jurisdiction project. Services Provided: Architect of Record: Client: News: Construction Barker Associates Daughters of Charity Health System None Completed 2014 Residential ​ ​ BACK TO PROJECTS

  • Borland International Campus

    Borland International Campus Scotts Valley, CA 650,000 SF structural steel three and four story module buildings with basements requiring poured-in-place concrete walls up to 38' tall. The building skirts consisted of GFRC panels poured-in-place concrete walls and glass wall systems. Project also included the decontamination of six acre site requiring cleaning of 60,000 cubic yards of soil with excavation to 45' deep. Responsible for the sitework, shell and tenant improvements. Services Provided: Architect of Record: Client: News: Construction DES Borland International None Completed 1994 Corporate ​ ​ BACK TO PROJECTS

  • Bellarmine Auxiliary Gym and Student Life Center

    Bellarmine Auxiliary Gym and Student Life Center San Jose, CA This 39,870 SF project consists of a new auxiliary gymnasium and student life center on the campus of Bellarmine College Preparatory. The building houses a gymnasium, weight training room and athletic support spaces, a student activities center, campus store, and faculty offices for the dean, nurse, counseling and college guidance staff. The two-story building totals four levels including a basement. Construction is concrete mat slab on grade and retaining walls, structural steel frame with light gauge steel infill, with glass, metal panel and plaster skin. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Bellarmine College Preparatory None Completed 2012 Education Design-Build LEED Silver BACK TO PROJECTS

  • UCSC Biomedical Sciences

    UCSC Biomedical Sciences Santa Cruz, CA This project consists of a 94,700 SF 4-story steel building with one story below grade. Exterior finishes consist of plaster, glass curtain wall, and metal panel while site improvements include sewer, storm water retention, tie-in to campus utilities for mechanical cooling, site concrete, AC paving and pervious paving. Interior improvements feature a basement vivarium, four stories of research lab space, office and meeting space, and the use of active chilled beams for heating and cooling. Pre-construction responsibilities include constructability review of design documents, multiple budget iterations validating the University’s ongoing budget, value engineering, development of subcontractor prequalification and bid documents, and management of the prequalification and bid phases. Construction phase responsibilities consist of 3D BIM coordination, compliance with targeted LEED points to achieve Gold Certification, and management of all construction activities. Services Provided: Architect of Record: Client: News: Design, Construction EHDD Architects University of California, Santa Cruz None Completed 2012 Education Design-Build LEED Gold BACK TO PROJECTS

  • SCU Sullivan Aquatic Center

    SCU Sullivan Aquatic Center Santa Clara, CA Construction and architectural services for new design/build pool facility at Santa Clara University. Scope of architectural services includes existing site studies, accessibility planning, full architectural, structural and pool design and space planning for future upgrades. Phase I work includes installing a pool size from 25 yard in width to 52 meters in length. Includes demolition of existing deck and berm to be replaced by new concrete deck, new electrical & mechanical systems for pool and associated site accessibility improvements. Phase II work to include permanent bleachers, a shade canopy equipped with solar pool heating equipment, new lighting, and a new scoreboard for aquatic events. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Santa Clara University None Completed 2008 Athletic Center Education Design-Build BACK TO PROJECTS

  • Clover

    Clover Petaluma, CA Project consisting of a 64,000 SF tenant improvement for Clover Sonoma, a Northern California dairy production and distribution company. Project includes a 22,000 SF industrial warehouse, 34,000 SF cooler, and a 6,000 SF office space for warehouse and distribution support. The project was constructed concurrent with the shell construction for this 36 ft. high single story, 94,000 SF building. The tilt-up concrete shell was constructed over an uninsulated slab on grade, with open web steel roof framing and a TPO roof membrane. The tenant improvement portion of the project, with pallet racking, 13 dock bays with integrated door and vertical leveler controls, furnished offices and a 6,000 SF mezzanine was completed, occupied, and in full operation within three months of start date, overlapping the shell construction (closure pours and roofing) by 1-1/2 months in order to expedite completion schedule to meet tenant needs. Highlights of the project include the 34,000 SF, 25 ft. high cooler constructed as a “box within a box”. The cooler design temperature of 38 degrees Fahrenheit was enabled by a refrigeration system comprised of two 70-ton roof mounted refrigeration condensing units and twelve 12-ton indoor refrigeration evaporative coil units suspended from the roof structure. The new Cader Lane facility has allowed Clover Sonoma to consolidate several of their smaller dairy product warehousing locations in Northern California to just two locations, both within Petaluma city limits. The operational efficiency gained by this along with fewer truck trips and reduced transportation needs results in warehousing and distribution that is much more energy efficient and environmentally friendly. Services Provided: Architect of Record: Client: News: Construction Vitae Architecture Clover Stornetta Farms, Inc. None Completed 2016 Industrial Center Tenant Improvement ​ BACK TO PROJECTS

  • SGI Crittenden

    SGI Crittenden Mountain View, CA 500,000 SF campus project consisting of four (4) four-story steel framed buildings. Exterior building features include curtain wall, corrugated metal panels, Alpolic flat metal panels and brick. Interior construction features include hard wall offices and lab space. Services Provided: Architect of Record: Client: News: Construction Studios Architects Silicon Graphics, Inc. None Completed 2001 Corporate ​ ​ BACK TO PROJECTS

  • HP Headquarters

    HP Headquarters Sunnyvale, CA Project consists of tenant improvement within a 6-story building for Hewlett Packard’s new headquarters. The 200,000 SF space features a CEO/executive floor on the 6th floor, with an executive briefing center with a dedicated cafeteria on the 4th floor. The 1st floor includes a media recording studio and innovation showcase space along with a Starbucks coffee station. This building serves as the new home for Hewlett Packard’s CEO and executive staff for the Bay Area. Services Provided: Architect of Record: Client: News: Construction Gensler Hewlett Packard Enterprise None Completed 2019 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • Stanford Crown Law School

    Stanford Crown Law School Stanford, CA This 30,000 SF remodel consisted of a complete gut and renovation to the 3rd floor known as the Robert Crown Law Library. Project includes new offices, seminar rooms, open work stations, support spaces, break room and restrooms. This renovation focuses on flexibility and collaboration, allowing students to work together with other students, faculty, research fellows, and visiting scholars, as well as government agencies & foundations. Project also features a new central lobby staircase that connects the overhauled 3rd floor law centers to all floors, five new skylights, and a dramatic 3-story wood slat feature wall. Services Provided: Architect of Record: Client: News: Construction CAW Architects The Board of Trustees of the Leland Stanford Junior University None Completed 2014 Education Tenant Improvement ​ BACK TO PROJECTS

bottom of page