  • 1701 Page Mill

    1701 Page Mill Palo Alto, CA This core and shell project consists of one 2-story building with underground garage and 116,000 SF of tenant space. Site work includes new sidewalks, landscaping, basketball court and parking for tenants. The exterior skin consists of pre-cast, standing seam metal siding, prodema panels and glass. Future tenants have access to fully operating kitchen, lab areas, offices and conference rooms. Services Provided: Architect of Record: Client: News: Construction STUDIOS Architecture Stanford Real Estate None Completed 2014 Corporate Stanford Research Park LEED Gold BACK TO PROJECTS

  • Bellarmine Lorry I. Lokey Academic Center

    Bellarmine Lorry I. Lokey Academic Center San Jose, CA This 53,000 SF project consists of a 2-story steel frame and concrete structure. The building features (27) classrooms, (2) multi-purpose rooms, a Learning Resource Center, and a Faculty Lounge complete with offices, meeting rooms, and a kitchen. The project also includes the demolition of the existing building and the installation of approximately (20) portables for use during construction. Services Provided: Architect of Record: Client: News: Construction Steinberg Hart Bellarmine College Preparatory None Completed 2011 Education LEED Gold ​ BACK TO PROJECTS

  • Hitachi

    Hitachi Santa Clara, CA This project features 39,000 SF tenant improvement on the 4th floor of 3315 Scott Boulevard Building C. Improvement includes private and open offices, copy areas, meeting rooms, break rooms, two presentation rooms, an observation area, and a high-end demo space where new products are presented to customers. Additionally, a new HVAC rooftop unit was installed to supply cooling to a new server room. The main lobby includes polished concrete finish & (2) large main entry glass walls. Services Provided: Architect of Record: Client: News: Construction Diehl Group Architects Hitachi America, Ltd. None Completed 2015 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • 335 Bryant

    335 Bryant Palo Alto, CA This project consists of a 10,000 SF 3-story wood-framed office building tenant improvement. The project includes demolition and remodel of all interior office and common space, re-roofing, cutting in new windows, new skin, and new exterior architectural features. Services Provided: Architect of Record: Client: News: Construction The Hayes Group Watershed Partners None Completed 2009 Tenant Improvement Corporate ​ BACK TO PROJECTS

  • St. Francis High School Graham Theater

    St. Francis High School Graham Theater Mountain View, CA This 20,000 SF Theatre Arts Building consists of 400 seats in the Theatre House with below grade storage rooms and orchestra pit. The structure is constructed with masonry and metal stud exterior walls with plaster finish, and a steel framed roof. The project also features a high ceiling lobby area, theatre house, large stage area, makeup rooms, scene shop, storage rooms and restrooms. Services Provided: Architect of Record: Client: News: Construction HMC Architects St. Francis High School None Completed 2009 Education ​ ​ BACK TO PROJECTS

  • Verizon Frisbee Campus

    Verizon Frisbee Campus San Jose, CA 623,142 SF interior tenant improvement for a new corporate campus built concurrently with the core/shell. The campus consists of a 576,892 SF 8-story office building, a 43,870 SF 2-story amenities building, and 2,380 SF single story welcome pavilion. The 8-story building includes conference rooms, open office areas, break areas and multi-purpose rooms. Specialty areas consists of a broadcast studio with dedicated server room, editing bays, audio visual “Experience” space with curved video walls and LED pulse wall, main server room equipped with hot aisle containment, CRAC units, security fencing and dedicated UPS room, 1st floor “Paseo” with game lounges, water feature, coffee bar, library, and music studio. The amenities building features a full cafeteria and kitchen with a fitness center, juice bar and health center upstairs, while the Welcome Pavilion functions as the campus entry check-in/lobby space. Services Provided: Architect of Record: Client: News: Construction Gensler New York, Gensler San Jose Hunter Storm Properties None Completed 2021 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • Stanford Denning House

    Stanford Denning House Stanford, CA This 18,000 SF wood frame building is located on the Stanford campus. The project consists of a 2-story featuring glass storefront and clerestory, executive offices, conference rooms, high-end collaborative dining area and classroom at 2nd floor, interior stairs and complete food service preparation area. Services Provided: Architect of Record: Client: News: Design, Construction Ennead Architects Stanford University None https://www.archdaily.com/915655/denning-house-at-stanford-university-ennead-architects https://www.architectmagazine.com/project-gallery/denning-house_o https://www.detail-online.com/article/to-study-in-a-treehouse-denning-house-at-stanford-35185/ Completed 2018 Corporate Stanford University Merit Award for Architecture 2020 - AIA Silicon Valley BACK TO PROJECTS

  • Dell EMC / DSSD

    Dell EMC / DSSD Menlo Park, CA This 130,000 SF tenant improvement within a new 4-story core/shell building was originally constructed by Devcon. The project consists of labs, a café, offices and a Central Utility Plant that is pre-manufactured in a new enclosure on site. Project also features installation of an emergency generator. Services Provided: Architect of Record: Client: News: Construction ArcTec, Inc. SI 46, LLC None Completed 2017 Corporate Tenant Improvement ​ BACK TO PROJECTS

  • Stanford Northwest Data Center

    Stanford Northwest Data Center Stanford, CA This project included a design/build purpose built single story 9,200 SF CMU structure to house critical data processing (data center) and communications equipment (communications hub) and an emergency call center. The data center houses 96 server racks and associated network racks for critical systems. The communications hub houses 32 network racks and additional fiber distribution frames, and is part of a campus wide network of redundant hubs which are designed to remain functional after a major earthquake or similar event. The call center is a back-up facility to be used in the event the main call center is rendered inoperable. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction, Inc. Stanford University None Completed 2014 Data Center Design-Build ​ BACK TO PROJECTS

  • Platform 16

    Platform 16 San Jose, CA Design/build project consisting of demolition to multiple existing structures and the construction of three new 6-story, steel framed high rises over a 3-level below grade parking structure. Project features core and warm shell offices, along with retail space total approximately 1,200,000 SF. The site features two large plazas between the buildings consisting of 16 terraces including an open air bridge connecting the third levels of two of the buildings. Services Provided: Architect of Record: Client: News: Design, Construction Devcon Construction Inc. and KPF Architects Boston Properties & TMG None https://newatlas.com/architecture/platform-16-kpf-office/ In Progress Corporate Retail ​ BACK TO PROJECTS

  • Hanover and Page Mill Building

    Hanover and Page Mill Building Palo Alto, CA This project consists of a new 2-story structure totaling approximately 136,000 SF of warm shell and core, which includes a 49,000 SF basement level for parking. Skin consists of a combination of GFRC, metal paneling/cladding, and curtainwall/storefront systems. The project features new sitework throughout, efficient MEP systems and exterior skin elements. The project has zero net energy goals and is a LEED Platinum Award Winner. Services Provided: Architect of Record: Client: News: Construction Form4 Architecture Hanover Page Mill Associates LP None https://www.e-architect.com/sanfrancisco/hanover-page-mill-palo-alto-building https://www.architectmagazine.com/project-gallery/hanover-page-mill https://archello.com/project/hanover-page-mill Completed 2015 Corporate Stanford Research Park LEED Platinum BACK TO PROJECTS

  • SCU Charney Hall

    SCU Charney Hall Santa Clara, CA This project includes the construction of a 108,000 SF, 3-story structural steel building with a 10” suspended slab and auger cast pile foundation system. Project includes the Panelli courtroom which is named after The Justice Edward A. Panelli, five lecture halls, four classrooms, an advocacy classroom, and study rooms. The project also features conference rooms, a Dean’s suite, law library, over 50 offices for the professors, roof skylights, a café, roof terrace, law school lounge, and glass guardrails on second and third floor opening to floors below. Services Provided: Architect of Record: Client: News: Construction Soloman Corwell Buenz Santa Clara University None Completed 2018 Education ​ ​ BACK TO PROJECTS